Old houses, small services
Most of the houses around Bloor West Village, Swansea and Baby Point were built between the 1910s and the 1940s, and many started life on a 30 or 60 amp service. Over the decades they picked up a second panel in the basement, a few extra circuits for a kitchen reno, and maybe a window air conditioner or two. Today the same houses are expected to run central air, an induction range, a dryer, a heat pump or a car charger, often at the same time.
We usually get the call when something forces the issue: an insurer asks about fuses, a breaker keeps tripping, a renovation needs more circuits than the panel has spaces, or someone is planning a basement apartment, laneway suite or garden suite at the back of the lot.
What we look at first
Before recommending anything, we look at four things:
- The service size coming into the house and the condition of the mast, meter base and service cable.
- The panel itself: brand, age, available spaces, and any signs of heat or corrosion.
- What is connected: every circuit traced, including any old sub-panels or knob-and-tube still feeding the upper floors.
- Your plans: a new kitchen, a heat pump, an EV, a suite. A load calculation turns all of that into a number.
Sometimes a new panel on the existing 100 amp service is all you need. Sometimes the right answer is 200 amps, which means new service equipment and coordinating the disconnect and reconnect with Toronto Hydro.
Permits and suites
Panel and service work in Ontario requires an Electrical Safety Authority (ESA) permit and inspection. If you are adding a secondary suite, a laneway suite or a garden suite, the electrical plan matters more: separate sub-panels, the feed out to the back of the lot, and the total load on the service all have to work together. We walk through those options with you before the job is booked, so there are no surprises halfway through.
How a panel job runs
- Text us a photo. A clear photo of the panel with the door open, plus your address and what you are planning.
- Assessment. We check the service, the panel and every circuit, then give you a straight recommendation.
- Scheduling. For a service upgrade, the Toronto Hydro disconnect and reconnect set the date. A panel swap on its own is normally done in a day.
- Swap, test, label. New panel in, every circuit tested and identified on a typed directory, then inspected.