Why it has to go
Knob-and-tube wiring uses separate hot and neutral wires on porcelain insulators, with no ground. When it was installed it was considered good work, but most of what is left in the west end is now close to a century old. The insulation on the wire gets brittle and cracks, connections have often been modified by several generations of owners, and the original circuits were never meant to carry modern loads. Where it has been covered with blown-in insulation, it can no longer shed heat the way it was designed to.
For most homeowners the trigger is insurance. Many insurers will not write or renew a policy on a house with active knob-and-tube without a plan to remove it.
Finding what is really there
A lot of houses have already been partly rewired, so the first job is figuring out how much knob-and-tube is still live and where. We trace circuits from the panel, check outlets and fixtures, and look in the basement and attic for old runs. Sometimes it is one or two circuits feeding upstairs bedrooms. Sometimes it is most of the house. Either way, you get a clear list of what needs to be replaced before any pricing is discussed.
Rewiring without gutting the house
New cable is fished through the existing walls and ceilings wherever possible, working from the basement, the attic and inside closets. Where a run cannot be fished, we make a small opening in a planned spot rather than opening a whole wall. If you are already renovating and the walls are open, it is the ideal time to rewire, and we can work around your contractor’s schedule.
Every new circuit is grounded, and outlets in kitchens, bathrooms and outdoors get the protection the current code requires. Old knob-and-tube runs are disconnected at the source, not just abandoned. Rewiring often goes hand in hand with a panel upgrade, and all of the work is done under an ESA permit with an inspection at the end.
How a rewire runs
- Inspection. We trace the existing wiring and map what is still knob-and-tube.
- Plan and scope. Circuit by circuit, with openings marked and any panel work identified.
- Rewire in phases. Most homes stay livable, with power restored to finished areas at the end of each day.
- ESA inspection. Final inspection and the paperwork your insurer will ask for.